Your install is coming up and we’re excited!

Here’s your Install Day Ready Plan to ensure a great install

Important Info for Your Double Glazing Installation

windows slides

Arrival Time

We depart our factory in Thornbury at approx 7am, and will arrive between 7:30am-8:00am for Metro Melbourne. Please ensure you are available to give access to your home.

windows door

Pets & Children

Double glazing your windows helps to reduce energy bills as more stable home temperature helps you to cut back on heating or air conditioning. This can help you to save money over the long-term

window security

Access For Vehicles

Ensure there is close parking for a large van. Your glass will be delivered on a specialist side-loading glass truck. Please keep your driveway clear, we will unload this and store it safely.

wnidow

Access Around Windows

Please clear a 1m x 1m space, both inside and outside, around each window.

Please remove window coverings (curtains, blinds, fly screens, external blinds, shutters) and move couches, lamps etc out of the way, and rugs off the floor. We don’t want anything to get damaged or trip over anything!

For outside, remove pot plants, rubble, etc. Safety is priority one for our teams, whilst we will take our best care not to damage garden beds and plants, this may be unavoidable if they are close to the windows.

thermal performance

Other Trades

Please don’t organise other trades while we’re on-site - we require full clear access to carry sharp glass safely through your home. If other trades impede/ delay our install we may have to charge you for the delay or reschedule.

power effective

Order Of Install

If you would like us to install a certain room first (for example, an office where you are working) just let us know on the day and we would be happy to accommodate this.

windows slides

Work Area

There is a lot of carpentry activity during installation - loud noises, dust and broken glass! We request an area of 3m x 3m close to the windows. A garage, carport or pergola works great.

If you don’t have this available, please notify us so we can work out other arrangements. We will use drop sheets around the window frames to protect your floor and of course we will clean-up the mess once we have finished.

diy double glazed retrofit window installation team
windows door

Your Safety

Please keep a safe distance from our work spaces as power tools and broken glass can cause serious injury.

For DIY-Assist jobs where you are involved in the installation, you will need the correct PPE including; cut resistant gloves, fully covered arms and legs, steel cap boots, hearing protection and safety glasses.

window security

Glass Storage Area

Depending on the number of panels installed, we will need a sturdy wall to stage the glass panels against. Please clear an area and a pathway to it.

wnidow

Rubbish and Waste Removal

All old glass and beading will be removed by us. It’s typical for old glass to break during the install process, and we use drop sheets and our industrial vacuum to clean up. We also recommend you vacuum your house after we leave to be safe.

thermal performance

Painting Preparation

Windows will be finished to a standard ready for your finishing trades. There will likely be some light cosmetic scratches on the frame, gap sealing and caulking may be desired. Please note, we do not perform painting or caulking services as these are separate trades.

For warranty purposes beading and capping should be painted within 12 weeks of installation.

power effective

Replacement Panels

Sometimes we will re-order a replacement panel due to tolerance limits that are encountered during the installation process. For example frames not being exactly square, concealed subframes, uncovered previous repairs, or unusual window construction.

This is a normal part of the retrofit process, and generally the older the house, the more unique the frames are, and more likely to have a few panels that do not fit immediately.

In this situation we will leave your existing glass in place and will return in 2-3 weeks with the replacement panels. We don’t ask for progress payments, and your invoice is only payable once the full job is complete.

windows slides

Broken Panels

While double glazing is exceptionally strong when inside a wooden frame, the toughened glass corners are very fragile and prone to breakage during the install process. If this occurs, we’ll order another panel and schedule another day to complete the install.

Your Pre-Install Checklist

  • check-solid-removebg-preview

    Pets and kids safely away for the day

  • check-solid-removebg-preview

    Street access for a side-loading glass truck

  • check-solid-removebg-preview

    A wide, clear path from the street to a glass storage area

  • check-solid-removebg-preview

    A 3mx3m work space, where broken glass, noise and dust are okay

  • check-solid-removebg-preview

    Power available on the site

  • check-solid-removebg-preview

    Windows have a 1m x 1m clear space, inside and outside

  • check-solid-removebg-preview

    No pot plants, prized plants, or tripping hazards on the outside of windows

  • check-solid-removebg-preview

    Window Coverings removed (curtains, blinds, flyscreens, etc)

  • check-solid-removebg-preview

    Exterior blinds, shades etc taken down

  • check-solid-removebg-preview

    Painter / Caulker organised (optional)

  • check-solid-removebg-preview

    Your calendar free at the competition time

20a6da99 5fa1 4afd add6 fdfdb04e4bd9 (1)

What Our Installers Can't Do

The health and safety of our install team is very important to us. As such they are not permitted to do the following:

  • windows slides

    Additional tasks not on the accepted quote

  • windows slides

    Removal of doors, window bars, plantation shutters or fixtures for access

What Our Installers Can Do

With your written approval for an additional cost of $125/hr + materials

  • windows slides

    Remove most, but not all, window coverings such as a shutter or blind

Timber Rot Repair

If we encounter timber rot during the installation process, generally we can repair this on site for $125/hr. However, we cannot determine the full extent until we begin this process. Whilst rare, if the extent of rot is structural, then we may not be able to retrofit the frame. In this case, we’ll work out what the best course of action is and get your approval before proceeding.

Upon Completion

When all the panels are installed, we will walk around and inspect each panel with you. We clean the windows with a solvent to remove any excess silicone, but some may remain on beading; this is normal and is typically removed by your painter in surface preparation. Likewise the solvent can leave a light film that is visible under certain conditions.

While we often install when you are not home, we require you to be present for the final sign-off so we can show you the operation of your new windows. Please note, if you are not around to inspect and sign-off and you later request a call-back, then a call back fee will be payable.

Questions & Point of Contact

Simply call our office on 1300 399 389 or email hello@retrofitdoubleglaze.com.au and we would be happy to answer any questions you may have.

See you soon!

Retrofit Double Glaze Install Team

Scroll to Top